Jul 18.2012,HN Engingeering has successfully gained the instrument package from Ashland chemicals (Nanjing) Co.,Ltd HEC Facitity Expansion project (project No.4508-003),The total price 0.5M RMB
Jul 18.2012,HN Engingeering has successfully gained the instrument package from Ashland chemicals (Nanjing) Co.,Ltd HEC Facitity Expansion project (project No.4508-003),The total price 0.5M RMB |